Closed
Sattva Engineering Construction Limited logo

Sattva Engineering Construction Limited IPO

SME IPOListedSATTVAENGGNSE
Current Market Price (CMP)
₹46.05(-38.60%)
Current Price (CMP)
₹46.05(-38.60%)

Live Market Quote

Listing Price & Gain
₹95.10(+26.80%)

Day 1 Exchange Open

IPO Issue Price
₹75

Band: ₹70 - ₹75

Total Subscription
184.2x

Overall Bid Demand

Total Issue Size
—

Gross Public Offer

IPO Schedule & Key Dates

IPO Bidding Opens
26 Aug 2025
IPO Bidding Closes
29 Aug 2025
Allotment & Refunds
Completed
Exchange Listing Day
03 Sept 2025

IPO Subscription Status

Breakdown of institutional, high-net-worth, and retail bidding demand

Overall Demand: 184.2x
Investor CategorySubscriptionDemand Scale
Qualified Institutional Buyers (QIB)0x
Non-Institutional Investors (NII / HNI)0x
Retail Individual Investors (RII)—
Total Subscription184.2x
Updated as on 29-Aug-2025 19:00:00

Listing Day & Return Performance

Listing Day Gain+26.80%
₹75 (Issue) → ₹95.10 (List)
Per share profit: +₹20.10
Holding Return (Till Date)-38.60%
₹75 (Issue) → ₹46.05 (CMP)
Net gain per share: ₹-28.95
Post-Listing Performance (Listing Day → Today):-51.58%

About Sattva Engineering Construction Limited IPO

Sattva Engineering Construction Limited is an Indian public offering categorized under the SME (Small and Medium Enterprise) segment. The public issue opened for bidding on 26 Aug 2025 and concluded on 29 Aug 2025, offering equity shares to institutional, non-institutional, and retail investors with an indicative price band of ₹70 - ₹75.

During the bidding window, Sattva Engineering Construction Limited witnessed heavy demand with an overall subscription of 184.2 times. Institutional investors (QIB) subscribed —, non-institutional high-net-worth investors (NII) subscribed —, and retail individual investors (RII) bid — their reserved quota.

The equity shares of Sattva Engineering Construction Limited officially debuted on the stock exchanges on 03 Sept 2025 at an opening listing price of ₹95.10, delivering a listing day return of +26.80% (premium) over the final issue price. As per the latest market data, the stock trades at ₹46.05, representing an overall decline of -38.60% since its IPO allotment.

Frequently Asked Questions

What was the issue price or price band of Sattva Engineering Construction Limited IPO?
The issue price of Sattva Engineering Construction Limited IPO was fixed at ₹75 per equity share. The indicative bidding price band was ₹70 - ₹75.
What were the open, close, and listing dates for Sattva Engineering Construction Limited IPO?
Sattva Engineering Construction Limited IPO opened on 26 Aug 2025, closed on 29 Aug 2025, listed on 03 Sept 2025.
How much was Sattva Engineering Construction Limited IPO subscribed?
The IPO received an overall subscription of 184.2 times. Category-wise, QIBs subscribed —x, NIIs subscribed —x, and Retail investors subscribed —x.
What was the listing price and listing gain of Sattva Engineering Construction Limited IPO?
Sattva Engineering Construction Limited IPO listed on the stock exchange at ₹95.10, delivering a listing gain of 26.80% compared to the IPO issue price of ₹75.
Is Sattva Engineering Construction Limited IPO a Mainboard or SME IPO?
Sattva Engineering Construction Limited IPO is a SME IPO listed on the SME platform of NSE.
What is the current return of Sattva Engineering Construction Limited IPO since its IPO?
At the latest market quote of ₹46.05, Sattva Engineering Construction Limited IPO has generated an all-time return of -38.60% since its initial public offering.

Related SME IPOs (2025)